Reference | Name | Status | Investment Amount |
---|---|---|---|
0006 | Zambia-Tanzania Power Transmission Interconnector (TAZA), as Part of the Zambia-Tanzania-Kenya (ZTK) Interconnector | S3A: project structuring |
USD 425 million |
0008 | Zambia, Zimbabwe - Batoka Gorge Hydro Power Plant (BHES) & Transmission Lines | S3A: project structuring |
USD 3.7 billion |
0001 | Zimbabwe - Construction of 2nd Line Alaska-Sherwood (400) 330 KV Transmission Line as a Component of the Central Transmission Corridor | S4A: tendering |
USD 64 million |
0004 | Zizabona Power Transmission Interconnector | S4A: tendering |
USD 240 million |